FOR A FREE HOMEOWNERS FOUNDATION ANALYSIS

KEEPING FOUNDATION
REPAIRS AFFORDABLE

Welcome to American Leveling Company. Ram Jack® provides EZPAY financing so that you get repairs done when you need them

YOUR SOLUTION

American Leveling Company offers the Ram Jack® system as a permanent solution for your foundation repair. Ram Jack® uses a patented piling system to permanently secure foundations. We are equipped with a variety of piling systems to meet a variety of needs. So, whether you’re embarking on a new construction project or repairing an existing foundation, we can ensure quality and peace of mind.

The Ram Jack bracket has been tested in excess of 100,000 lbs. of force.

SIGNS & CAUSES

INSIDE

OUTSIDE

GARAGE

BASEMENT

The extended guide sleeve loads the piling vertically and rifles the piling as it advances to load-bearing strata.

  1. 1. DRIVING HEAD

  2. The Ram Jack® driving head delivers rapid power to long sections of piling for a faster installation and a stronger pile.

  3. 2. HYDRAULIC RAMS

  4. They have over 70,000 lbs. of driving force available to deliver to the Ram Jack® pile column.

  5. 3. BRACKET

  6. The Ram Jack® bracket has been tested in excess of 100,000 lbs. of force.

  7. 4. GUIDE SLEEVE

  8. The extended guide sleeve loads the piling vertically and rifles the piling as it advances to load-bearing strata.

  9. 5. STEEL PIER

  10. The Ram Jack® steel pile material has been tested and specifically selected for its unusually high quality to resist bending and buckling. Tensile tests average 150,000 lbs.

  11. 6. PILE CONNECTOR

  12. The 10-inch pile connector is composed of a smaller diameter section of the same high-quality tubing and is crimped into one end of each pile section. The connector is a slip joint into the next pile system.

  13. 7. EXPANSION RING

  14. This ring expands the soil away from the piling to reduce friction during the driving process for maximum penetration through unstable soil.

  15. 8. SOIL PLUG

  16. Creates a solid base for the lead pile section to bear on firm strata.

WHAT OUR CUSTOMERS ARE SAYING

The Ram Jack® steel pile material has been tested and specifically selected for its unusually high quality to resist bending and buckling. Tensile tests average 150,000 lbs.

FINANCING OPTIONS

KEEPING FOUNDATION REPAIRS AFFORDABLE

Faced with repairing the foundation of your home? At Ram Jack®, we keep our services affordable and cost-effective, ensuring the job is done right the first time, so you aren’t hit with more repairs down the road. Ram Jack provides EZPAY financing options, including same-as-cash and reduced interest loan options, so that you don’t have to wait on resolving urgent foundation problems. We help you get the repairs you need, when you need them.

CALL US TO DISCUSS OUR FINANCING OPTIONS IN YOUR AREA!

12-Month Same-as-cash option

  • No interest/no payments

  • Loans by EnerBank USA

Reduced-interest loan option

  • 5-years & 6.99% interest

  • 60 month repayment windows

  • Loans by EnerBank USA

CONTACT US

FOR YOUR FREE HOMEOWNERS CONSULTATION

CALL TODAY FOR A FREE HOMEOWNERS FOUNDATION ANALYSIS

We’re happy to offer free homeowners foundation analyses on your home within the Oklahoma City metro area. Place the longevity of your foundation in the hands of the proven professionals at American Leveling Company.